WE HAVE SOME GREAT LIMITED-TIME OFFERS - CLICK HERE TO VIEW THEM WE SHIP WORLDWIDE    /    All UK ORDERS GREATER THAN £75 EX VAT DELIVERED FREE    /    WE SHIP WORLDWIDE    /    ALL EUROPEAN ORDERS GREATER THAN £500.00 ex VAT DELIVERED FREE    /    WE SHIP WORLDWIDE
    Share this page on Facebook   Share this page on LinkedIn   Share this page on Twitter   Share this page on Whatsapp   

    Rapid Ref : 790185052  

    Orbitalum BRB 2 Full Auto, Boiler Pipe Preparation Machine, Pneumatic, 19.1 - 38mm Tube ID
    790185052

    £6750.00  EX VAT
     Buy in 3 easy interest free payments of £2250.00† with

    The BRB 2 Full Auto is exclusively developed for shortening and detaching tubes-to-tube sheets.

    Features

    • Automatic feed and clamping system
    • No external control box and pedals are required
    • Easy and ergonomic operation
    • Start of operation with just one touch switch
    • Optimised speed range, especially for heat exchanger applications
    • Stepless adjustable feed speed range
    • Adjustable end stop for exact shortening of tubes and for ending the operating process
    • Fast positioning of the machine
    • Integrated end stop for fast positioning of the machine in the pipe
    • Tube end preparation for standardised weld preparation

    BRB 2 & BRB 4 with Std Clamp FAQs

    Answers to common questions about internally clamped boiler tube preparation machines, from choosing a clamp kit to safe use and care.

    What does an internally clamped boiler tube preparation machine do?icon-minus-redicon-plus-red

    It is a portable machine that grips the tube from the inside and then machines the tube end ready for welding. Clamps fit inside the bore and expand against a mandrel to centre and hold the machine, and a rotating head carries the cutting tools around the tube end.

    Machines of this type can usually face the tube end square, cut the bevel and bore the inside edge in one set-up, depending on the tooling fitted. The data plate and manual give the tube size and wall thickness the machine is designed for.

    Why is the bevel on a boiler tube important for the weld?icon-minus-redicon-plus-red

    The bevel gives the welder access to the root of the joint so the first pass can fuse properly. Poor preparation is a recognised cause of incomplete root fusion: a root face that is too thick, a root gap that is too small, or a bevel angle that is too small can all stop the arc reaching the root.

    The bevel angle, root face and root gap are normally set by the welding procedure for the job, so cut to that. A machined bevel is uniform all round the tube, which makes it easier to hold the correct gap than hand grinding does.

    Why use a cold-cutting machine rather than thermal cutting?icon-minus-redicon-plus-red

    A machine like this removes metal with cutting tools rather than heat. Thermal cutting creates a heat-affected zone, a band of metal beside the cut whose properties have changed, and these changes are usually undesirable because they can reduce toughness or corrosion resistance and increase the risk of cracking.

    Mechanical preparation avoids that zone and leaves a clean, square face ready for welding. It also removes the oxidised edge that thermal cutting leaves, which would otherwise need grinding off. Follow the maker's advice for the material being cut.

    Why does the machine chatter or leave a poor finish?icon-minus-redicon-plus-red

    Chatter generally points to a lack of rigidity. Machining guidance from cutting tool makers lists a weak fixture or poor clamping, worn tools and cutting data that is too aggressive among the usual causes of vibration and poor surface finish.

    Stop, re-seat and re-tighten the clamp, check the tool bits for wear or damage, and reduce the feed. Clean the inside of the tube so the clamp grips properly, and check the manual for the recommended settings for the material. A rough or noisy cut is a sign to stop and investigate, not to push on.

    Shop Similar Categories