Double Seal Purge System FAQs
Answers on setting up, sizing, venting and safely using a twin-disc purge system inside pipe and tube.
Why does a double seal system use less gas than flooding the whole pipe?

Because only the short length between the two seals is purged, not the whole bore. The HSE notes that the quantity of gas released can be significantly less with localised purging techniques such as damming than when an entire pipe or vessel is flooded.
A smaller purged volume generally means a faster purge and less gas to vent afterwards. It also means less gas to be released if something goes wrong, which is a safety benefit as well as a practical one.
Can I rely on the seals to stop purge gas escaping into the pipe?

No. The HSE states that the seal on dams and bladders should not be relied on to prevent gas leakage, and that the pipe or fabrication may still become a confined space. Gas can pass the discs, especially if the fit is poor or the bore is irregular.
That means you must plan for it: vent spare gas safely, never put your head or body into pipework that has held inert gas, and carry out a risk assessment before the work starts. If entry into a space that may contain purge gas cannot be avoided, a safe system of work and a calibrated oxygen meter are essential.
Where should the vent from a double seal purge go?

Excess purge gas should be led away, ideally outside the pipe or fabrication, rather than released into a confined or poorly ventilated area. The HSE describes bleeding excess gas from dams through hoses and discharging it outside the fabrication.
In a workshop, make sure the vent outlet is in a well-ventilated place away from low-lying areas such as pits and sumps where argon in particular can collect. Keep the vent clear and unrestricted during welding, and check your risk assessment covers where the gas will end up.
Does a short purge time mean I can skip checking the oxygen level?

No. Makers often quote short purge times, but the actual time depends on pipe size, gas flow and how well the discs seal on your job. Time alone does not prove the oxygen has dropped far enough.
The most reliable way to know is to measure the oxygen at the vent or in the purged section with a suitably calibrated oxygen meter and weld only when it reads at or below the level your welding procedure requires. Trade guidance also stresses that allowing plenty of time does not guarantee the oxygen has been removed, and that a device capable of accurate and reliable measurement is the best option.